October 1: Tile being laid in the upstairs bathroom
Viewed: 123 times.
|
Door into the playroom
Viewed: 88 times.
|
Wiring run down the left beam, from left to right, and drilled through, now hanging out the bottom -- for attaching a light fixture. Groove will be filled in and virtually invisible once done.
Viewed: 98 times.
|
Tile installation in downstairs bathroom
Viewed: 92 times.
|
Further work on the masonry heater -- it'll be done tomorrow
Viewed: 91 times.
|
Looking down at the masonry heater
Viewed: 105 times.
|
Closer view of wiring groove
Viewed: 81 times.
|
Upstairs bathroom tile at the end of the day
Viewed: 94 times.
|
Door into the mead area installed
Viewed: 88 times.
|
Downstairs bathroom tile at the end of the day
Viewed: 88 times.
|
Problem can light installation on front porch fixed
Viewed: 109 times.
|
Can light trims installed in ceiling
Viewed: 94 times.
|
Wiring coming out of the beam
Viewed: 91 times.
|
Don took this pic -- sparks from the saw Gary was using to trim the extra metal from the bits that connect the blocks of stone
Viewed: 88 times.
|
Another pic of Gary with saw
Viewed: 93 times.
|
Pretty edge added to top of stove
Viewed: 90 times.
|
October 2: Upstairs bath with completed tile
Viewed: 102 times.
|
Closer view of tile in tub area
Viewed: 99 times.
|
Downstairs bath with completed tile
Viewed: 111 times.
|
Masonry heater progress, 11am
Viewed: 97 times.
|
Side view
Viewed: 99 times.
|
Masonry heater, 3:30pm
Viewed: 87 times.
|
Chimney hardware
Viewed: 91 times.
|
Inside the bake oven
Viewed: 100 times.
|
Decorative stones laid out for application
Viewed: 102 times.
|